<\!DOCTYPE html> Agent #07 โ€” Facilities Inspection & Predictive Maintenance | Industrial Integrity Agents
<\!-- NAV --> <\!-- HERO -->
Facilities Inspection & Predictive Maintenance ยท Agent #07

AI-Powered Facility Integrity
from P&ID to Predicted Failure

Click any equipment on the P&ID diagram to see live corrosion trends, vibration signatures, thermography overlays, and AI-predicted failure windows. Generate RBI assessments and inspection reports in seconds.

20%
Maintenance Cost Reduction
15%
Equipment Uptime Increase
40%
Report Generation Savings
90-Day
Failure Prediction Window
๐ŸŽ“ Learn to Sell This Turnaround inspection โ†’ Module 3 (Workflow Discovery) ยท Compliance โ†’ Module 2
Module 3: Discovery โ†’ Module 2: Stakeholders โ†’
<\!-- STATUS BAR -->
Inspection Agent Running
|
3 Equipment Alerts
|
Unit: Crude Distillation Unit #2
|
API 580/581 RBI Compliant
|
Next Turnaround: 127 days
--:--:-- UTC
<\!-- MAIN LAYOUT -->
<\!-- LEFT COLUMN -->
<\!-- P&ID DIAGRAM -->
๐Ÿญ
Facility P&ID โ€” Clickable Equipment Diagram
Click any equipment node to inspect
<\!-- Grid lines (subtle) --> <\!-- Pipe lines --> <\!-- Main feed line --> <\!-- Top return --> <\!-- Bottom drain --> <\!-- Verticals --> <\!-- Flow arrows --> <\!-- VESSEL V-101 (large cylinder) --> V-101 FLASH DRUM <\!-- Status dot --> <\!-- HEAT EXCHANGER E-201 --> E-201 HT. EXCHGR <\!-- COMPRESSOR K-101 --> K-101 COMPRESSOR <\!-- STORAGE TANK TK-301 --> <\!-- Level indicator --> TK-301 STORAGE TANK <\!-- PUMP P-101 --> P-101 PUMP <\!-- Labels for pipe segments --> FEED LINE 8" OVERHEAD 4" <\!-- Instrument symbols (circles with letters) --> PI TI FI
Normal
Monitor Closely
Action Required
โ† Click equipment to inspect
<\!-- EQUIPMENT DETAIL PANEL (hidden until selection) -->
โ€”
โ€”
MEDIUM RISK
Corrosion Rate Trend (mpy)
Vibration Spectrum (mm/s)
Wall Thickness UT (mm)
โš ๏ธ
Predicted bearing failure
Based on vibration trend analysis and bearing wear pattern
47
days remaining
<\!-- WORK ORDER PRIORITIZATION -->
๐Ÿ“‹
Maintenance Work Order Prioritization
Ranked by risk ร— production impact ร— regulatory
<\!-- populated by JS -->
<\!-- INSPECTION REPORT GENERATOR -->
๐Ÿ“„
Auto-Generated Inspection Report
API 510 / ASME PCC-2 Compliant
Configure equipment parameters above and click Generate to watch your inspection report populate in real time...
<\!-- ROI CALCULATOR -->
๐Ÿ’ฐ
ROI Calculator โ€” Predictive Maintenance Savings
<\!-- populated by JS -->
<\!-- end main-col --> <\!-- SIDEBAR --> <\!-- end sidebar -->
<\!-- end main-layout -->
<\!-- end content-wrap -->