Agent #02 Β· Reservoir Engineering Β· Live Simulation

Reservoir Management
& Production Forecasting

Autonomous AI analyzing decline curves, running what-if scenarios, ranking infill candidates, and updating reserve estimates β€” cutting forecast cycle time by 80%.

80%
Forecast Time Saved
+6.4%
Production Gain
25%
Maintenance Savings
15Γ—
Wells / Engineer
πŸŽ“ Learn to Sell This High-ROI story β†’ Module 6 (Business Case) Β· Pilot design for reservoir tools β†’ Module 5
Module 6: ROI Case β†’ Module 5: Pilot Design β†’
18 Active Wells
3 Under Surveillance
2 Anomalies
Field: Block 14-Bravo Β· Permian Basin
Avg. Reservoir Pressure: 2,847 psi
--:-- CDT

Decline Curve Analysis β€” Field 14-B

Oil (BOPD)
Gas (MCFD)
WC%
Historical Production
Base Forecast (Arps)
P10–P90 Confidence
Infill Scenario
βš™ What-If Scenario Analysis
2 Infill Wells Β· Base Completion
2 wells
Standard
80 ac
+18.4%
Production Uplift
4.82 MMBOE
Incremental EUR
$42.6M
NPV10 ($MM)
18 mo
Payout Period
🎯 Infill Well Candidates β€” Ranked by EUR Γ— NPV
Rank Well Name Location EUR (MBOE) NPV10 ($MM) Peak Rate Risk Recommendation
πŸ“Š Live Production Dashboard
3,847
BOPD
Oil Rate
8,214
MCFD
Gas Rate
1,203
BWPD
Water Rate
2,847
psi
Avg Reservoir Pressure
1,642
psi
Flowing BHP
2,134
SCF/BBL
GOR

Reservoir Pressure Depletion

Wolfcamp A
78%
Wolfcamp B
84%
Wolfcamp D
61%
Bone Spring
53%
⚠ AI Anomaly Detection
πŸ“‹ Automated Reserve Update

ROI Impact Calculator

Estimate the value Agent #02 delivers to your reservoir engineering team

Your Field Parameters

Forecast Cycle Time Reduction
4.8 weeks β†’ 4.8 days
80% reduction per cycle
Annual Labor Cost Saved
$432,000
Engineers reallocated to high-value work
Wells per Engineer (vs. current)
11 β†’ 45+
15Γ— leverage improvement
Production Efficiency Gain (5–8%)
$0 estimate
Based on field production rates