Agent #02 · Live Interactive Demo

Reservoir Engineering
& Flow Simulation

Select a reservoir scenario. The agent ingests well logs, builds a geological model, runs flow simulation, and generates development recommendations — in 45 minutes vs. 6–8 weeks manually.

85%
Faster Characterization
15%
RF Prediction Improvement
40%
Spacing Optimization Faster
500+
Wells Per Engineer

Interactive Reservoir Model Viewer

Select a pre-loaded reservoir scenario to trigger the agent processing pipeline.

🛢️
Tight Oil · Horizontal Wells

Permian Basin — Wolfcamp A

West Texas · ~8,500 ft TVD
Formation Wolfcamp A
Well Type Horizontal, Multi-Frac
Target Fluid Black Oil
Reservoir Press. 5,800 psi
▶ Run Agent Analysis →
🌊
Deepwater · Turbidite Sandstone

Gulf of Mexico Deepwater

Green Canyon Block · ~15,000 ft TVD
Formation Miocene Turbidite
Completion Subsea Tree, FPSO
Target Fluid Light Oil / Gas
Reservoir Press. 12,400 psi
▶ Run Agent Analysis →
⚗️
Condensate Window · Multi-Stage Frac

Eagle Ford Shale

South Texas · ~10,000 ft TVD
Formation Eagle Ford Shale
Well Type Hz, 40-Stage Frac
Target Fluid Gas Condensate
Reservoir Press. 7,200 psi
▶ Run Agent Analysis →
Processing: Permian Basin — Wolfcamp A
Agent is analyzing reservoir data and building simulation model…
📊
Ingesting Well Logs & Core Data
~3s
🗺️
Building Geological Model
~3s
Running Flow Simulation
~4s
📋
Generating Recommendations
~2s
LOADING DATA STREAMS…
Initializing 0%
Traditional Reservoir Study: 6–8 Weeks ⚡ Agent: 45 Minutes

Production Forecast & Development Scenarios

Permian Basin — Wolfcamp A · Wolfcamp A formation · P50 type curve

30-Year Production Decline Curve (P50)
Arps Hyperbolic · b=1.2 · Initial decline rate: 85%/yr
EUR (P50)
950 MBOE
Estimated Ultimate Recovery
IP30 Rate
1,420 BOE/d
30-day average initial production
Decline Exponent (b)
1.2
Hyperbolic Arps parameter
Recovery Factor
9.8%
% of OOIP recovered at abandonment
Development Scenario Comparison
Conservative / Base Case / Aggressive — well spacing & completion design variants
Scenario Well Count EUR / Well Total Recovery NPV IRR

Well Spacing Optimizer

Adjust completion parameters. The agent calculates optimal well spacing accounting for frac interference, drainage efficiency, and section economics.

Completion Parameters Wolfcamp A Reference Case
Well Spacing (N-S) 660 ft
330 ft1,320 ft
Lateral Length 10,000 ft
5,000 ft15,000 ft
Proppant Loading 1,800 lbs/ft
1,000 lbs/ft3,000 lbs/ft
Live Output Updates in real-time
EUR per Well
Total Section Recovery
NPV per Well
Wells per Section
⚡ Agent Recommendation
Adjust sliders to generate spacing recommendation.

ROI Calculator

Quantify the value of faster reservoir studies and optimized well placement for your annual drilling program.

Drilling Program Parameters
Wells Planned per Year 50 wells/yr
10 wells200 wells
Average Well Cost $8M
$5M$15M
Current Study Cycle Time 8 weeks
4 weeks12 weeks
Value Analysis
Annual Value Created
From spacing optimization + schedule acceleration
Time Saved
EUR Improvement
Payback Period
Agent Study Time
45 min